Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | ATO |
Payment Terms : | L/C, T/T |
Supply Ability : | 10 PIECES PER MONTH |
Delivery Time : | 10-15 WORK DAYS |
Coiled Tubing BOP Working Pressure 2000psi~20000psi
Descriptions of Coiled Tubing BOP Working Pressure 2000psi~20000psi:
Coiled tubing well control equipment such as conventional
four-ram/composite double-ram coiled tubing blowout preventers and
blowout boxes produced by we equipped on the coiled tubing
operation vehicles of many oil service companies and oil fields.
The rams of the tubing blowout preventer are suspended/semi-sealed,
sheared/full-sealed rams, which greatly reduce the weight and
height of the equipment and meet the requirements of operating
conditions while meeting the requirements of technology and
functions.
Until now, We has provided nearly 100 supporting products for
several coiled tubing vehicle projects, making an important
contribution to the localization of well control equipment for
coiled tubing operations.
Specifications:
Nominal Bore Diameter | 2-9/16"~5-1/8" |
Working Pressure | 2000psi~20000psi |
Recommended Operating Pressure | 1500psi(2800psi for sh ear ram) |
Side Outlet | 2-1/16"x10000psi |
Size of Pipe be Sheared | OD 2-3/8",wall 0.204",CT110 class |
Slip Rams Holding Weight | 40T(2" coil tubing) |
Temperature Class for Metallic Material | T75,T-20,T0 |
Executive Standard | API 16A 4rd , API RP 16ST |
Working Medium | petroleum, natural gas, water, mud, gas containing H2S, CO2 |
![]() |